TERMS OF REFERENCE:
To consider and report on ways and means of securing a permanent nucleus of high quality floats in Greater Hastings Annual Blossom Festival Procession.
PRELIMINARY CONSIDERATIONS:
(1) Roster System
(a) A Roster System whether voluntary or binding presents itself as a sound basis for long range planning and organisation of the procession. Annual organisation by Greater Hastings would be minimised, a basis for enlargement and improvement of procession established, co-operative economics in construction made feasible and the goodwill of participants fostered.
(b) The responsibility, cost and time involved in preparing a good quality float are such that it appears undesirable to attempt to commit a regular participant at less than 4 or 5 yearly intervals.
(2) Cost of Floats
For the purposes of this Report the following costs of building a complete float (paying for labour and materials) are assumed to be a reasonable assessment.
Major size £200
Medium £150
Mini £100
(3) Cost of Booklets (Commercially Printed)
250 16 page promotion booklets (say) £48.0.0 or 3/- each.
1000 100 page Float Construction booklets (say) £225 or 4/6 each.
(4) Assistance to Participants
The main resistance to participation seems to result from inconvenience and loss of time to commercial enterprises, lack of profitability, cost and difficulty in conception construction etc.
For those reasons it is considered essential that Greater Hastings provide the following assistance to participants:-
(a) A procession theme accompanied by sketch designs (say 30-40) some years in advance.
(b) A comprehensive booklet on designing and constructing of floats, making and application of blossom, etc.
(c) Prepared artificial blossom (as participants expense)
(d) Labour to apply blossom
(e) Organisation of co-operative use of basic float frames (and if possible, evolve a “standard” basic frame).
SUGGESTED SCHEME:
Our consideration has been restricted only to schemes whereby participation is “guaranteed” in advance. Of the other alternatives the voluntary roster in particular is thought worth pursing.
CONTRACT PARTICIPATION SCHEME:
Greater Hastings enters into written agreement with participants to grant advertising rights over a five year period in return for an undertaking to enter a float of a stated value, when rostered, once